Title and parcel status
What the records establish
SG 1891/2018 identifies Erf 5151; Proclamation 47/2020 declares Extension 18 approved.
Still to confirm
Current title, owner, endorsements, transfer stage and any altered erf identity/extent.
Land portfolio / Extension 18
Under offerIf available again, the site merits screening by a builder's-yard or building-materials operator seeking a smaller trade property within the wider commercial precinct. The 2017 valuation describes commercial/builder's-yard use and the 2018 electrical report identifies a Special: Builder's Yard stand. These are dated documentary descriptions; obtain the current scheme clauses before confirming the precise permitted operation or building envelope.
Under offer, confirmed by owner on 2026-09-17. Ask Hans for the latest position.
Edition 2026-10-05 · The pack and this parcel’s decision summary use the same information. Historical records retain their own dates.
Under offer. This is background information; confirm status with Hans before pursuing a new discussion.
Decision brief · Reviewed 2026-10-03. Source records retain their own dates.
Erf 5151 is the builder's-yard site within Unitas Park Extension 18, Vereeniging, Emfuleni, Gauteng, beside the filling-station and Extension 19 retail precinct on the R54 corridor. General Plan SG 1891/2018 records 7,436 m² (0.7436 ha) for the original erf. This is the surveyed area before any subsequently registered access changes, not a net buildable area.
The owner reported the property under offer on 17 September 2026. This pack provides status and background only; it is not an invitation to pursue a competing transaction. Further buyer screening depends on Hans confirming that the existing transaction permits it. The neighbouring filling-station Erf 5150 is owner-reported sold and excluded.
If available again, the site merits screening by a builder's-yard or building-materials operator seeking a smaller trade property within the wider commercial precinct. The 2017 valuation describes commercial/builder's-yard use and the 2018 electrical report identifies a Special: Builder's Yard stand. These are dated documentary descriptions; obtain the current scheme clauses before confirming the precise permitted operation or building envelope.
Its relationship to the filling-station and retail sites may be commercially relevant, but their presence does not establish customer volumes or shared access rights. A practical operator assessment should test delivery-vehicle movements, outdoor storage, setbacks and loading against the final property layout.
The portfolio objective is a land sale, subject here to the existing offer. No current offer amount or asking price is established in the reviewed material. If Hans releases the property for further discussion, he should reconfirm availability, transaction perimeter and price guidance before a proposal is submitted. The transaction perimeter must exclude the sold filling-station site. The historical valuation is not presented as today's price.
Evidence held and the confirmation still needed for a buyer decision.
SG 1891/2018 identifies Erf 5151; Proclamation 47/2020 declares Extension 18 approved.
Current title, owner, endorsements, transfer stage and any altered erf identity/extent.
Builder's-yard use is recorded in 2017/2018 documents; the 2020 notice records Amendment Scheme N1232.
Current scheme map, clauses, use limitations, building controls and outstanding conditions.
The signed 2019 agreement specifies developer-installed works; the 2020 conditions impose a 3 m sewer servitude on this erf.
Current connection capacity, completed installations, handover and outstanding obligations.
The 2018 report estimates 40 kVA for Erf 5151; July 2021 correspondence reports approval of a temporary 180 kVA connection for Extension 18.
Actual connection/energisation, permanent allocation and current supply arrangements; neither figure proves supply today.
February 2026 access-change drawing and 2015 commercial dolomite/CGS evidence are held.
Approved/registered deductions and access, usable layout, applicable ground precautions and environmental decision/scope.
Confirm the existing transaction status with Hans. If the property becomes available, arrange a conveyancer/planner check of current title, access changes and operative scheme controls, plus an engineer’s current service-status and cost schedule. An operator can then assess a clearly defined site.
Discuss this parcel with Hans ↗PDF references use physical page numbers. These are source locators, not confirmation that historical conditions remain current.
Read the scope and date before relying on a record. Valuations are historical opinions at their stated dates, not asking prices. Only the public distribution copies are linked here.
Document index updated 2026-09-17.
Shared township · 2018
Includes Erven 5150 and 5151; current title status remains unverified.
Source references: SRC-fc98975785bb
Shared townships · 24 Jun 2020
Proclamations 47 and 48 of 2020. Ext18: pages 19–23; Ext19: pages 24–27. Current registration and condition fulfilment remain separate.
Source references: SRC-e44caa0610ea
Proposal
Owner drawing already used on the atlas. Proposed changes do not establish registered rights.
Source references: SRC-33357c7e86ea
Historical owner illustration
Labels the proposed Extensions 18–21. Useful for orientation only: this image uses historical areas, shows unproclaimed Ext20 and does not establish approved rights or the surveyed K55 reserve.
Source references: SRC-4025c0ffad17
Planning / engineering record · 2017-12-05 (document footer; approval stamp requires reading separately)
Approved establishment conditions for Extension 18; retains pre-proclamation and development obligations.
Source references: SRC-1f66e34bb701
Planning / engineering record · 2018-11
Preliminary civil-services report covers the combined Extensions18–21 scheme, previously Ext17. It describes proposed infrastructure and conditional availability, including possible residential water storage and sewage treatment measures; it does not prove installed capacity.
Source references: SRC-c05e7597f539
Planning / engineering record · 2018-11-16
Electrical scheme for Portion232/Extension18 proposes supply for filling station and builder’s yard. Full supply depends on Sonlandpark substation upgrades; the report describes a temporary connection requiring renewal.
Source references: SRC-79426a6371cd
Planning / engineering record · 2015-11-24
Feasibility investigation for the commercial Ext17 proposal on part of Portion224 identifies two hazard zones and conditional commercial suitability. Township links describe historical development context and do not establish coverage of every present erf or later residential scheme.
Source references: SRC-7130460ddccc
Planning / engineering record · 2015-12-11
Council comments support the commercial township conditionally following review of VGI3925. They require site risk management, precautionary measures, inspections and certification, and expressly warn that changes can affect applicability.
Source references: SRC-f3862bde0924
Planning / engineering record · 2015-10
The supplied file is a single catchment drawing for the Ext17 proposal, despite being named a report. It shows existing drains and catchments, not a complete approved stormwater design.
Source references: SRC-600ad0be29cc
Planning / engineering record · 2017-11
Traffic study assesses a historical commercial/day-hospital scheme using2014 counts and2022 projections. It recommends signalisation and a pre-construction wayleave; this does not establish current access rights or adequacy for the later residential scheme.
Source references: SRC-117c338849d5
Planning / engineering record · 2026-02
Drawing262009-106 marks proposed access-related subdivisions and consolidations around the filling-station erf.
Source references: SRC-90767a9ada54
Planning / engineering record
Owner-supplied proposed access engineering drawing around Erven 5150–5152; does not establish approved access or completed works.
Source references: SRC-560a3cbaedcd
Historical township parent and P224 deduction · 2018
Both sheets identify Portion 232, a portion of Portion 224, and the small-scale diagram for Extension 18. Parent survey supports subdivision history; it is not additional saleable land or confirmation of current registration.
Source references: SRC-a865166ca3da, SRC-b92250e81ca3
Historical record · 2017-09-13 (p5; p3 references12September)
Historical valuation and supporting annexures. Retained as commercial context and a source of assertions; surveyed extent, title and development status must be resolved from the relevant primary records.
Source references: SRC-6c63e58517a9
Parcel / shared record · 2025-12-04 · Redacted copy
Signed purchase and sale document for Erf5150, with cadastral identifiers and ancillary licence/access provisions. Establishes the existence of an agreement, not whether transfer or other obligations have been completed.
Source references: SRC-e8e697dfc02a
Parcel / shared record · 2019-11-12 · Redacted copy
Signed services agreement covers Extensions18–21 and allocates engineering obligations. It is stronger evidence of arrangements than preliminary studies, but completion, current capacity and fulfilment require separate records.
Source references: SRC-7eb9108baeac
Shared / historical record · 2023-07
SMR418/combined1 portfolio planning overview and status table.
Source references: SRC-c339508e546c
Historical proposal · Undated
Entire image visually inspected: proposed compilation phases1–4, explicitly names Portion223,224,221 and townships. Useful shared concept; yields/geotechnical labels unverified.
Source references: SRC-4e8b78bd0e07
Reformatted historical schedule · Multi-period historical schedule
Historical municipal account schedule for Extension 18. It does not establish current rates clearance or allocation to individual erven. Viewing copy reorganises all 64 monthly records and 29 source columns into readable tables; constant fields appear once.
Source references: SRC-54dd0c870556
Historical shared township correspondence · 2021-07-01
Historical engineer correspondence seeking municipal confirmation of supply and remedial works. Does not establish present capacity or an electrical connection for Remainder 221.
Source references: SRC-8082304c7474