Skip to parcel information
schulden property co

Land portfolio / Extension 18

Under offer

Erf 5151 · Extension 18

If available again, the site merits screening by a builder's-yard or building-materials operator seeking a smaller trade property within the wider commercial precinct. The 2017 valuation describes commercial/builder's-yard use and the 2018 electrical report identifies a Special: Builder's Yard stand. These are dated documentary descriptions; obtain the current scheme clauses before confirming the precise permitted operation or building envelope.

Under offer, confirmed by owner on 2026-09-17. Ask Hans for the latest position.

Download the parcel decision pack

Erf 5151 · Extension 18 · decision briefDownload PDF · 2 pages · 0.03 MB

Edition 2026-10-05 · The pack and this parcel’s decision summary use the same information. Historical records retain their own dates.

Under offer. This is background information; confirm status with Hans before pursuing a new discussion.

Location
Extension 18, Unitas Park, Vereeniging
Area basis
0.7436 ha · original whole erf; proposed remainder extent unconfirmed
Development focus, subject to verification
Builder’s yard / trade uses
Survey reference
SG 1891/2018
View Erf 5151 · Extension 18 on the map ↗

Decision brief · Reviewed 2026-10-03. Source records retain their own dates.

What is available

Erf 5151 is the builder's-yard site within Unitas Park Extension 18, Vereeniging, Emfuleni, Gauteng, beside the filling-station and Extension 19 retail precinct on the R54 corridor. General Plan SG 1891/2018 records 7,436 m² (0.7436 ha) for the original erf. This is the surveyed area before any subsequently registered access changes, not a net buildable area.

The owner reported the property under offer on 17 September 2026. This pack provides status and background only; it is not an invitation to pursue a competing transaction. Further buyer screening depends on Hans confirming that the existing transaction permits it. The neighbouring filling-station Erf 5150 is owner-reported sold and excluded.

Why consider this parcel

If available again, the site merits screening by a builder's-yard or building-materials operator seeking a smaller trade property within the wider commercial precinct. The 2017 valuation describes commercial/builder's-yard use and the 2018 electrical report identifies a Special: Builder's Yard stand. These are dated documentary descriptions; obtain the current scheme clauses before confirming the precise permitted operation or building envelope.

Its relationship to the filling-station and retail sites may be commercially relevant, but their presence does not establish customer volumes or shared access rights. A practical operator assessment should test delivery-vehicle movements, outdoor storage, setbacks and loading against the final property layout.

Transaction expectations

The portfolio objective is a land sale, subject here to the existing offer. No current offer amount or asking price is established in the reviewed material. If Hans releases the property for further discussion, he should reconfirm availability, transaction perimeter and price guidance before a proposal is submitted. The transaction perimeter must exclude the sold filling-station site. The historical valuation is not presented as today's price.

Rights and services

Evidence held and the confirmation still needed for a buyer decision.

Title and parcel status

What the records establish

SG 1891/2018 identifies Erf 5151; Proclamation 47/2020 declares Extension 18 approved.

Still to confirm

Current title, owner, endorsements, transfer stage and any altered erf identity/extent.

Land-use rights

What the records establish

Builder's-yard use is recorded in 2017/2018 documents; the 2020 notice records Amendment Scheme N1232.

Still to confirm

Current scheme map, clauses, use limitations, building controls and outstanding conditions.

Water and sewer

What the records establish

The signed 2019 agreement specifies developer-installed works; the 2020 conditions impose a 3 m sewer servitude on this erf.

Still to confirm

Current connection capacity, completed installations, handover and outstanding obligations.

Electricity

What the records establish

The 2018 report estimates 40 kVA for Erf 5151; July 2021 correspondence reports approval of a temporary 180 kVA connection for Extension 18.

Still to confirm

Actual connection/energisation, permanent allocation and current supply arrangements; neither figure proves supply today.

Access, ground and environment

What the records establish

February 2026 access-change drawing and 2015 commercial dolomite/CGS evidence are held.

Still to confirm

Approved/registered deductions and access, usable layout, applicable ground precautions and environmental decision/scope.

Matters that could change the decision

  • Availability: obtain Hans's express confirmation that the existing offer allows a new discussion before involving a buyer.
  • Final footprint and access: establish how the proposed subdivisions for the neighbouring filling station affect Erf 5151; account for the sewer servitude and stormwater requirements.
  • Operator fit: confirm the exact builder's-yard rights and reconcile loading, storage and ground-design requirements with the chosen operation.
  • Servicing cost and timing: distinguish the historic temporary power arrangement from current supply, and price the remaining water, sewer and electricity works. The 2019 agreement permits a bulk-availability review after five years without commencement, not automatic expiry.

The next step

Confirm the existing transaction status with Hans. If the property becomes available, arrange a conveyancer/planner check of current title, access changes and operative scheme controls, plus an engineer’s current service-status and cost schedule. An operator can then assess a clearly defined site.

Discuss this parcel with Hans ↗
Key evidence references

PDF references use physical page numbers. These are source locators, not confirmation that historical conditions remain current.

  • General plan SG 1891/2018; 2020 proclamation: SRC-e44caa0610ea, PDF pp 19, 22–23.
  • February 2026 access proposal: SRC-90767a9ada54, PDF p 1.
  • 2019 services agreement: SRC-7eb9108baeac, PDF pp 3–4, 10–18, 40–41; July 2021 electrical letter: SRC-8082304c7474, PDF pp 1–2.

Public documents and sources

Read the scope and date before relying on a record. Valuations are historical opinions at their stated dates, not asking prices. Only the public distribution copies are linked here.

Document index updated 2026-09-17.

  • Extension 18 general plan — SG 1891/2018

    Shared township · 2018

    Includes Erven 5150 and 5151; current title status remains unverified.

    Source references: SRC-fc98975785bb

  • Township proclamations and conditions

    Shared townships · 24 Jun 2020

    Proclamations 47 and 48 of 2020. Ext18: pages 19–23; Ext19: pages 24–27. Current registration and condition fulfilment remain separate.

    Source references: SRC-e44caa0610ea

  • Proposed access and consolidation

    Proposal

    Owner drawing already used on the atlas. Proposed changes do not establish registered rights.

    Source references: SRC-33357c7e86ea

  • Extensions 18–21 — historical proposed layout

    Historical owner illustration

    Labels the proposed Extensions 18–21. Useful for orientation only: this image uses historical areas, shows unproclaimed Ext20 and does not establish approved rights or the surveyed K55 reserve.

    Source references: SRC-4025c0ffad17

  • Extension 18 — establishment conditions (2017)

    Planning / engineering record · 2017-12-05 (document footer; approval stamp requires reading separately)

    Approved establishment conditions for Extension 18; retains pre-proclamation and development obligations.

    Source references: SRC-1f66e34bb701

  • Extensions 18–21 — preliminary civil services report (2018)

    Planning / engineering record · 2018-11

    Preliminary civil-services report covers the combined Extensions18–21 scheme, previously Ext17. It describes proposed infrastructure and conditional availability, including possible residential water storage and sewage treatment measures; it does not prove installed capacity.

    Source references: SRC-c05e7597f539

  • Extension 18 — electrical services report VE1605 (2018)

    Planning / engineering record · 2018-11-16

    Electrical scheme for Portion232/Extension18 proposes supply for filling station and builder’s yard. Full supply depends on Sonlandpark substation upgrades; the report describes a temporary connection requiring renewal.

    Source references: SRC-79426a6371cd

  • Historical commercial dolomite report — VGI3925 (2015)

    Planning / engineering record · 2015-11-24

    Feasibility investigation for the commercial Ext17 proposal on part of Portion224 identifies two hazard zones and conditional commercial suitability. Township links describe historical development context and do not establish coverage of every present erf or later residential scheme.

    Source references: SRC-7130460ddccc

  • Commercial dolomite report — CGS comments (2015)

    Planning / engineering record · 2015-12-11

    Council comments support the commercial township conditionally following review of VGI3925. They require site risk management, precautionary measures, inspections and certification, and expressly warn that changes can affect applicability.

    Source references: SRC-f3862bde0924

  • Historical Ext17 scheme — stormwater catchment drawing (2015)

    Planning / engineering record · 2015-10

    The supplied file is a single catchment drawing for the Ext17 proposal, despite being named a report. It shows existing drains and catchments, not a complete approved stormwater design.

    Source references: SRC-600ad0be29cc

  • Historical commercial scheme — traffic assessment (2017)

    Planning / engineering record · 2017-11

    Traffic study assesses a historical commercial/day-hospital scheme using2014 counts and2022 projections. It recommends signalisation and a pre-construction wayleave; this does not establish current access rights or adequacy for the later residential scheme.

    Source references: SRC-117c338849d5

  • Erven 5150–5152 — proposed access subdivisions (2026)

    Planning / engineering record · 2026-02

    Drawing262009-106 marks proposed access-related subdivisions and consolidations around the filling-station erf.

    Source references: SRC-90767a9ada54

  • Extension 18 — proposed access engineering drawing

    Planning / engineering record

    Owner-supplied proposed access engineering drawing around Erven 5150–5152; does not establish approved access or completed works.

    Source references: SRC-560a3cbaedcd

  • Extension 18 / Portion 232 — Parent survey — SG 1894/2018

    Historical township parent and P224 deduction · 2018

    Both sheets identify Portion 232, a portion of Portion 224, and the small-scale diagram for Extension 18. Parent survey supports subdivision history; it is not additional saleable land or confirmation of current registration.

    Source references: SRC-a865166ca3da, SRC-b92250e81ca3

  • Erf 5151 — historical valuation (2017)

    Historical record · 2017-09-13 (p5; p3 references12September)

    Historical valuation and supporting annexures. Retained as commercial context and a source of assertions; surveyed extent, title and development status must be resolved from the relevant primary records.

    Source references: SRC-6c63e58517a9

  • Erf 5150 — signed sale agreement (2025)

    Parcel / shared record · 2025-12-04 · Redacted copy

    Signed purchase and sale document for Erf5150, with cadastral identifiers and ancillary licence/access provisions. Establishes the existence of an agreement, not whether transfer or other obligations have been completed.

    Source references: SRC-e8e697dfc02a

  • Extensions 18–21 — signed services agreement (2019)

    Parcel / shared record · 2019-11-12 · Redacted copy

    Signed services agreement covers Extensions18–21 and allocates engineering obligations. It is stronger evidence of arrangements than preliminary studies, but completion, current capacity and fulfilment require separate records.

    Source references: SRC-7eb9108baeac

  • Unitas Park — Planning overview and status table — SMR418-combined1 — 2023

    Shared / historical record · 2023-07

    SMR418/combined1 portfolio planning overview and status table.

    Source references: SRC-c339508e546c

  • Unitas Park — Phases 1–4 development concept

    Historical proposal · Undated

    Entire image visually inspected: proposed compilation phases1–4, explicitly names Portion223,224,221 and townships. Useful shared concept; yields/geotechnical labels unverified.

    Source references: SRC-4e8b78bd0e07

  • Extension 18 — Municipal account schedule

    Reformatted historical schedule · Multi-period historical schedule

    Historical municipal account schedule for Extension 18. It does not establish current rates clearance or allocation to individual erven. Viewing copy reorganises all 64 monthly records and 29 source columns into readable tables; constant fields appear once.

    Source references: SRC-54dd0c870556

  • Extensions 18–21 — Electrical connection correspondence — VE1605 — 2021-07-01

    Historical shared township correspondence · 2021-07-01

    Historical engineer correspondence seeking municipal confirmation of supply and remedial works. Does not establish present capacity or an electrical connection for Remainder 221.

    Source references: SRC-8082304c7474

Discuss the land with Hans

Hans van Heerden · Owner contact

Ask about current availability, arrange a conversation or request further information.

Tell Hans what you want to build.

Explore a retail precinct, a housing phase or a different idea for the land. Speak directly with the owner about the site that fits your plans.

  1. Share your idea. Tell Hans which land interests you, what you have in mind and when you would like to start.
  2. Explore the opportunity. The parcel packs and source documents are available now to help your team take a closer look.
  3. Shape a proposal. Discuss current availability, the purchase perimeter, price guidance and any feasibility period or conditions you would like to propose.
Download the existing decision packs PDF · 0.18 MB

Schulden Property Co · Unitas Park, Vereeniging, Gauteng, South Africa. Privacy information