Skip to parcel information
schulden property co

Land portfolio / Extension 19

Enquire with owner

Erf 5152 · Extension 19

Extension 19 is a combined retail opportunity requiring assessment of both Erven 5152 and 5153. The 2020 proclamation requires consolidation; whether it has been registered is unconfirmed. Scheme size should follow current rights, access, service capacity and tenant demand.

Download the parcel decision pack

Erf 5152 · Extension 19 · decision briefDownload PDF · 2 pages · 0.03 MB

Edition 2026-10-05 · The pack and this parcel’s decision summary use the same information. Historical records retain their own dates.

Erven 5152 and 5153 form one combined retail opportunity. Consolidation is required; registration remains unconfirmed.

Location
Extension 19, Unitas Park, Vereeniging
Area basis
1.6277 ha · original survey extent; proposed access deduction unresolved
Development focus, subject to verification
Shopping-centre component
Survey reference
SG 737/2019
View Erf 5152 · Extension 19 on the map ↗

Part of the Extension 19 proposed consolidation. This erf is a component of that site, not additional land.

Decision brief · Reviewed 2026-10-03. Source records retain their own dates.

What is available

Erf 5152 is the smaller surveyed component of the Extension 19 retail precinct in Unitas Park, Vereeniging, Emfuleni, Gauteng, adjoining the Extension 18 filling-station/trade precinct along the R54 corridor. General Plan SG 737/2019 records 1.6277 ha for this erf. Together, Erven 5152 and 5153 measure 7.0112 ha, excluding township roads. These are surveyed areas, not net developable areas.

This brief identifies one component; it does not offer an independently transferable stand. The June 2020 proclamation requires the two erven to be consolidated. Whether consolidation has been registered, and the current transferable property description, need confirmation. The February 2026 access proposal is not evidence that boundary changes have been registered.

The access proposal leaves 1.4804 ha on Erf 5152 plus 5.3835 ha on Erf 5153, totalling 6.8639 ha. This proposed remainder differs from the original combined survey extent of 7.0112 ha; neither boundary changes nor consolidation registration are confirmed.

Why consider this parcel

The principal opportunity is participation in a combined retail development, assessed against an operator's actual space, access and servicing requirements. Historical material evaluates a shopping-centre concept for the combined site. It gives a useful starting point for buyer screening, but does not establish a current approved floor-area entitlement or an independently viable scheme on Erf 5152.

A phased retail scheme could be investigated if current rights, tenant interest and infrastructure support it. The 2021 market study projected catchment growth to 2025; delivered housing, occupied households, competing retail and tenant demand now need a fresh assessment.

Transaction expectations

The objective is a land sale. No current asking price for this erf or the combined acquisition is established in the reviewed record. Ask Hans to confirm the sale perimeter, availability and price guidance before a proposal is submitted. Separate sale terms have not been established and must first pass the consolidation/title review. Historic combined valuations have not been apportioned between the erven.

Rights and services

Evidence held and the confirmation still needed for a buyer decision.

Title and parcel status

What the records establish

SG 737/2019 and Proclamation 48/2020 identify the two erven and required consolidation.

Still to confirm

Current deed, owner, endorsements, successor identity and transferable extent.

Land-use rights

What the records establish

The 2020 notice records Amendment Scheme N1314; historic material evaluates retail.

Still to confirm

Current scheme map, clauses, permitted uses, development controls and outstanding conditions.

Water and sewer

What the records establish

The signed 2019 agreement sets out developer-installed links and internal works.

Still to confirm

Current capacity, connection points, completed works, handover and remaining costs.

Electricity

What the records establish

The July 2021 engineer's letter reports conditional approvals and unresolved bulk supply; the municipal substation section was then nonoperational.

Still to confirm

Current allocation, remediation, connection works, energisation and phase-specific costs.

Access, ground and environment

What the records establish

A February 2026 access proposal and 2015 commercial dolomite investigation/CGS comments are held.

Still to confirm

Registered access and servitudes, current traffic approval, parcel-specific ground requirements and environmental decision/applicability.

Matters that could change the decision

  • Acquisition perimeter: confirm consolidation status before pursuing a standalone purchase or allocating a price to this component.
  • Usable layout: The published conditions specifically impose a 3 m sewer servitude on Erf 5152. Its usable layout must also accommodate the proposed access change beside the filling-station site. Registered rights, final access and stormwater requirements may change the development footprint.
  • Infrastructure commitment: establish the remaining works, cost allocation and programme. The 2019 agreement allows a bulk-availability review after five years without commencement; it is not an automatic expiry provision.
  • Commercial scale: update the catchment and obtain operator feedback before selecting scheme size or phase timing.

The next step

The buyer's first decision is whether to assess the combined Extension 19 opportunity. Request one coordinated review with Hans, the conveyancer, planner and engineer covering the current title/consolidation record, scheme controls, access drawing and current service-capacity/cost schedule. Hans should first confirm availability and a single transaction perimeter.

Discuss this parcel with Hans ↗
Key evidence references

PDF references use physical page numbers. These are source locators, not confirmation that historical conditions remain current.

  • General plan SG 737/2019, sheet 1: SRC-ec01949233c7; 2020 proclamation: SRC-e44caa0610ea, PDF pp 24–27.
  • February 2026 access proposal: SRC-90767a9ada54, PDF p 1.
  • 2019 services agreement: SRC-7eb9108baeac, PDF pp 3–4, 10–18, 40–41; July 2021 electrical letter: SRC-8082304c7474, PDF pp 1–2.

Public documents and sources

Read the scope and date before relying on a record. Valuations are historical opinions at their stated dates, not asking prices. Only the public distribution copies are linked here.

Document index updated 2026-09-17.

  • Extension 19 general plan — SG 737/2019

    Shared township · 2019

    Includes Erven 5152 and 5153. Planned combined presentation is not proof of registered consolidation.

    Source references: SRC-ec01949233c7

  • Township proclamations and conditions

    Shared townships · 24 Jun 2020

    Proclamations 47 and 48 of 2020. Ext18: pages 19–23; Ext19: pages 24–27. Current registration and condition fulfilment remain separate.

    Source references: SRC-e44caa0610ea

  • Proposed access and consolidation

    Proposal

    Owner drawing already used on the atlas. Proposed changes do not establish registered rights.

    Source references: SRC-33357c7e86ea

  • Extensions 18–21 — historical proposed layout

    Historical owner illustration

    Labels the proposed Extensions 18–21. Useful for orientation only: this image uses historical areas, shows unproclaimed Ext20 and does not establish approved rights or the surveyed K55 reserve.

    Source references: SRC-4025c0ffad17

  • Extension 19 — establishment conditions (2017)

    Planning / engineering record · 2017-12-05 (document footer; approval stamp requires reading separately)

    Approved establishment conditions for Extension 19; retains pre-proclamation and development obligations.

    Source references: SRC-d75a29a3e746

  • Extensions 18–21 — preliminary civil services report (2018)

    Planning / engineering record · 2018-11

    Preliminary civil-services report covers the combined Extensions18–21 scheme, previously Ext17. It describes proposed infrastructure and conditional availability, including possible residential water storage and sewage treatment measures; it does not prove installed capacity.

    Source references: SRC-c05e7597f539

  • Historical commercial dolomite report — VGI3925 (2015)

    Planning / engineering record · 2015-11-24

    Feasibility investigation for the commercial Ext17 proposal on part of Portion224 identifies two hazard zones and conditional commercial suitability. Township links describe historical development context and do not establish coverage of every present erf or later residential scheme.

    Source references: SRC-7130460ddccc

  • Commercial dolomite report — CGS comments (2015)

    Planning / engineering record · 2015-12-11

    Council comments support the commercial township conditionally following review of VGI3925. They require site risk management, precautionary measures, inspections and certification, and expressly warn that changes can affect applicability.

    Source references: SRC-f3862bde0924

  • Historical Ext17 scheme — stormwater catchment drawing (2015)

    Planning / engineering record · 2015-10

    The supplied file is a single catchment drawing for the Ext17 proposal, despite being named a report. It shows existing drains and catchments, not a complete approved stormwater design.

    Source references: SRC-600ad0be29cc

  • Historical commercial scheme — traffic assessment (2017)

    Planning / engineering record · 2017-11

    Traffic study assesses a historical commercial/day-hospital scheme using2014 counts and2022 projections. It recommends signalisation and a pre-construction wayleave; this does not establish current access rights or adequacy for the later residential scheme.

    Source references: SRC-117c338849d5

  • Erven 5150–5152 — proposed access subdivisions (2026)

    Planning / engineering record · 2026-02

    Drawing262009-106 marks proposed access-related subdivisions and consolidations around the filling-station erf.

    Source references: SRC-90767a9ada54

  • Extension 18 — proposed access engineering drawing

    Planning / engineering record

    Owner-supplied proposed access engineering drawing around Erven 5150–5152; does not establish approved access or completed works.

    Source references: SRC-560a3cbaedcd

  • Extension 19 / Portion 234 — Parent survey — SG 736/2019

    Historical township parent and P224 deduction · 2019

    Both sheets identify Portion 234, a portion of Portion 224, and the small-scale diagram for Extension 19. Parent survey supports subdivision history; it is not additional saleable land or confirmation of current registration.

    Source references: SRC-62c035eff7fc, SRC-bd21d65f219d

  • Extension 19 — historical valuation (2017)

    Historical record · 2017-09-13 (PDF p5; p3 references12September)

    Historical valuation and supporting annexures. Retained as commercial context and a source of assertions; surveyed extent, title and development status must be resolved from the relevant primary records.

    Source references: SRC-1c7f31782ab0

  • Extensions 18–21 — signed services agreement (2019)

    Parcel / shared record · 2019-11-12 · Redacted copy

    Signed services agreement covers Extensions18–21 and allocates engineering obligations. It is stronger evidence of arrangements than preliminary studies, but completion, current capacity and fulfilment require separate records.

    Source references: SRC-7eb9108baeac

  • Extension 19 retail precinct — market update (2021)

    Parcel / shared record · 2021-06 (filename; 2021 supported by contents)

    Desktop retail feasibility update identifies the commercial site as Portion224. Its forecasts depend on demographic growth and delivery of proposed housing, and are not observations of2025 outcomes.

    Source references: SRC-12d764710e74

  • Unitas Park — Planning overview and status table — SMR418-combined1 — 2023

    Shared / historical record · 2023-07

    SMR418/combined1 portfolio planning overview and status table.

    Source references: SRC-c339508e546c

  • Unitas Park — Phases 1–4 development concept

    Historical proposal · Undated

    Entire image visually inspected: proposed compilation phases1–4, explicitly names Portion223,224,221 and townships. Useful shared concept; yields/geotechnical labels unverified.

    Source references: SRC-4e8b78bd0e07

  • Extensions 18–21 — Electrical connection correspondence — VE1605 — 2021-07-01

    Historical shared township correspondence · 2021-07-01

    Historical engineer correspondence seeking municipal confirmation of supply and remedial works. Does not establish present capacity or an electrical connection for Remainder 221.

    Source references: SRC-8082304c7474

Discuss the land with Hans

Hans van Heerden · Owner contact

Ask about current availability, arrange a conversation or request further information.

Tell Hans what you want to build.

Explore a retail precinct, a housing phase or a different idea for the land. Speak directly with the owner about the site that fits your plans.

  1. Share your idea. Tell Hans which land interests you, what you have in mind and when you would like to start.
  2. Explore the opportunity. The parcel packs and source documents are available now to help your team take a closer look.
  3. Shape a proposal. Discuss current availability, the purchase perimeter, price guidance and any feasibility period or conditions you would like to propose.
Download the existing decision packs PDF · 0.18 MB

Schulden Property Co · Unitas Park, Vereeniging, Gauteng, South Africa. Privacy information