Title and parcel status
What the records establish
SG 737/2019 and Proclamation 48/2020 identify the two erven and required consolidation.
Still to confirm
Current deed, owner, endorsements, successor identity and transferable extent.
Land portfolio / Extension 19
Enquire with ownerExtension 19 is a combined retail opportunity requiring assessment of both Erven 5152 and 5153. The 2020 proclamation requires consolidation; whether it has been registered is unconfirmed. Scheme size should follow current rights, access, service capacity and tenant demand.
Edition 2026-10-05 · The pack and this parcel’s decision summary use the same information. Historical records retain their own dates.
Erven 5152 and 5153 form one combined retail opportunity. Consolidation is required; registration remains unconfirmed.
Part of the Extension 19 proposed consolidation. This erf is a component of that site, not additional land.
Decision brief · Reviewed 2026-10-03. Source records retain their own dates.
Erf 5152 is the smaller surveyed component of the Extension 19 retail precinct in Unitas Park, Vereeniging, Emfuleni, Gauteng, adjoining the Extension 18 filling-station/trade precinct along the R54 corridor. General Plan SG 737/2019 records 1.6277 ha for this erf. Together, Erven 5152 and 5153 measure 7.0112 ha, excluding township roads. These are surveyed areas, not net developable areas.
This brief identifies one component; it does not offer an independently transferable stand. The June 2020 proclamation requires the two erven to be consolidated. Whether consolidation has been registered, and the current transferable property description, need confirmation. The February 2026 access proposal is not evidence that boundary changes have been registered.
The access proposal leaves 1.4804 ha on Erf 5152 plus 5.3835 ha on Erf 5153, totalling 6.8639 ha. This proposed remainder differs from the original combined survey extent of 7.0112 ha; neither boundary changes nor consolidation registration are confirmed.
The principal opportunity is participation in a combined retail development, assessed against an operator's actual space, access and servicing requirements. Historical material evaluates a shopping-centre concept for the combined site. It gives a useful starting point for buyer screening, but does not establish a current approved floor-area entitlement or an independently viable scheme on Erf 5152.
A phased retail scheme could be investigated if current rights, tenant interest and infrastructure support it. The 2021 market study projected catchment growth to 2025; delivered housing, occupied households, competing retail and tenant demand now need a fresh assessment.
The objective is a land sale. No current asking price for this erf or the combined acquisition is established in the reviewed record. Ask Hans to confirm the sale perimeter, availability and price guidance before a proposal is submitted. Separate sale terms have not been established and must first pass the consolidation/title review. Historic combined valuations have not been apportioned between the erven.
Evidence held and the confirmation still needed for a buyer decision.
SG 737/2019 and Proclamation 48/2020 identify the two erven and required consolidation.
Current deed, owner, endorsements, successor identity and transferable extent.
The 2020 notice records Amendment Scheme N1314; historic material evaluates retail.
Current scheme map, clauses, permitted uses, development controls and outstanding conditions.
The signed 2019 agreement sets out developer-installed links and internal works.
Current capacity, connection points, completed works, handover and remaining costs.
The July 2021 engineer's letter reports conditional approvals and unresolved bulk supply; the municipal substation section was then nonoperational.
Current allocation, remediation, connection works, energisation and phase-specific costs.
A February 2026 access proposal and 2015 commercial dolomite investigation/CGS comments are held.
Registered access and servitudes, current traffic approval, parcel-specific ground requirements and environmental decision/applicability.
The buyer's first decision is whether to assess the combined Extension 19 opportunity. Request one coordinated review with Hans, the conveyancer, planner and engineer covering the current title/consolidation record, scheme controls, access drawing and current service-capacity/cost schedule. Hans should first confirm availability and a single transaction perimeter.
Discuss this parcel with Hans ↗PDF references use physical page numbers. These are source locators, not confirmation that historical conditions remain current.
Read the scope and date before relying on a record. Valuations are historical opinions at their stated dates, not asking prices. Only the public distribution copies are linked here.
Document index updated 2026-09-17.
Shared township · 2019
Includes Erven 5152 and 5153. Planned combined presentation is not proof of registered consolidation.
Source references: SRC-ec01949233c7
Shared townships · 24 Jun 2020
Proclamations 47 and 48 of 2020. Ext18: pages 19–23; Ext19: pages 24–27. Current registration and condition fulfilment remain separate.
Source references: SRC-e44caa0610ea
Proposal
Owner drawing already used on the atlas. Proposed changes do not establish registered rights.
Source references: SRC-33357c7e86ea
Historical owner illustration
Labels the proposed Extensions 18–21. Useful for orientation only: this image uses historical areas, shows unproclaimed Ext20 and does not establish approved rights or the surveyed K55 reserve.
Source references: SRC-4025c0ffad17
Planning / engineering record · 2017-12-05 (document footer; approval stamp requires reading separately)
Approved establishment conditions for Extension 19; retains pre-proclamation and development obligations.
Source references: SRC-d75a29a3e746
Planning / engineering record · 2018-11
Preliminary civil-services report covers the combined Extensions18–21 scheme, previously Ext17. It describes proposed infrastructure and conditional availability, including possible residential water storage and sewage treatment measures; it does not prove installed capacity.
Source references: SRC-c05e7597f539
Planning / engineering record · 2015-11-24
Feasibility investigation for the commercial Ext17 proposal on part of Portion224 identifies two hazard zones and conditional commercial suitability. Township links describe historical development context and do not establish coverage of every present erf or later residential scheme.
Source references: SRC-7130460ddccc
Planning / engineering record · 2015-12-11
Council comments support the commercial township conditionally following review of VGI3925. They require site risk management, precautionary measures, inspections and certification, and expressly warn that changes can affect applicability.
Source references: SRC-f3862bde0924
Planning / engineering record · 2015-10
The supplied file is a single catchment drawing for the Ext17 proposal, despite being named a report. It shows existing drains and catchments, not a complete approved stormwater design.
Source references: SRC-600ad0be29cc
Planning / engineering record · 2017-11
Traffic study assesses a historical commercial/day-hospital scheme using2014 counts and2022 projections. It recommends signalisation and a pre-construction wayleave; this does not establish current access rights or adequacy for the later residential scheme.
Source references: SRC-117c338849d5
Planning / engineering record · 2026-02
Drawing262009-106 marks proposed access-related subdivisions and consolidations around the filling-station erf.
Source references: SRC-90767a9ada54
Planning / engineering record
Owner-supplied proposed access engineering drawing around Erven 5150–5152; does not establish approved access or completed works.
Source references: SRC-560a3cbaedcd
Historical township parent and P224 deduction · 2019
Both sheets identify Portion 234, a portion of Portion 224, and the small-scale diagram for Extension 19. Parent survey supports subdivision history; it is not additional saleable land or confirmation of current registration.
Source references: SRC-62c035eff7fc, SRC-bd21d65f219d
Historical record · 2017-09-13 (PDF p5; p3 references12September)
Historical valuation and supporting annexures. Retained as commercial context and a source of assertions; surveyed extent, title and development status must be resolved from the relevant primary records.
Source references: SRC-1c7f31782ab0
Parcel / shared record · 2019-11-12 · Redacted copy
Signed services agreement covers Extensions18–21 and allocates engineering obligations. It is stronger evidence of arrangements than preliminary studies, but completion, current capacity and fulfilment require separate records.
Source references: SRC-7eb9108baeac
Parcel / shared record · 2021-06 (filename; 2021 supported by contents)
Desktop retail feasibility update identifies the commercial site as Portion224. Its forecasts depend on demographic growth and delivery of proposed housing, and are not observations of2025 outcomes.
Source references: SRC-12d764710e74
Shared / historical record · 2023-07
SMR418/combined1 portfolio planning overview and status table.
Source references: SRC-c339508e546c
Historical proposal · Undated
Entire image visually inspected: proposed compilation phases1–4, explicitly names Portion223,224,221 and townships. Useful shared concept; yields/geotechnical labels unverified.
Source references: SRC-4e8b78bd0e07
Historical shared township correspondence · 2021-07-01
Historical engineer correspondence seeking municipal confirmation of supply and remedial works. Does not establish present capacity or an electrical connection for Remainder 221.
Source references: SRC-8082304c7474