DEVELOPMENT OPPORTUNITIES / UNITAS PARK · VEREENIGING

Reviewed 7 October 2026

Data centres & industry

Infrastructure feasibility opportunity

Explore a substantial landholding for a phased data-centre campus or infrastructure-led industrial development in Unitas Park, Vereeniging. Portion 223 offers land scale worth screening; the decisive next step is establishing a deliverable power and connectivity solution.

Why this could work

A coordinated assessment of land, utility connections and phasing could identify a viable first development footprint. We welcome operators and development partners able to specify their requirements and test the site against them. This is an early feasibility opportunity: no data-centre entitlement, electrical allocation or resilient fibre solution has been established.

  • A substantial single holding allows an operator to investigate phased construction, future expansion and the space needed for supporting infrastructure.
  • Parallel power and fibre enquiries can inform an integrated assessment of connection costs, programme and resilience before a detailed campus design.
  • A requirements-led discussion can establish whether data centres or another infrastructure-led use merits the next stage of investment.

Land to explore

Portion 223 · 128.1732 ha ↗

Gross extent recorded in approved survey SG7424/2008 and historical title T2700/2009. Servitudes, access, ground conditions and planning requirements must determine the usable footprint.

What is established

  • Approved survey and historical title records support the stated gross extent; current title status and development rights need confirmation.
  • Preliminary electricity and multi-provider fibre enquiries have been issued. Technical capacity, physically diverse routes, prices and delivery dates remain unconfirmed.

What to confirm

  • What initial and ultimate import capacity is required, and what supply solution survives the operator’s specified failure scenarios?
  • Can providers deliver physically diverse fibre routes, suitable endpoints, latency and surviving capacity at an acceptable cost?
  • What planning, access, cooling-water, environmental and ground requirements define a feasible first phase?

Let’s shape the first phase

Share your initial load, phasing, connectivity and site requirements with Hans. We can assemble the parcel evidence and structure a technical screening discussion before agreeing any acquisition or development terms.

Discuss this opportunity with Hans →Hans van Heerden · hans@schulden.land · +27 82 881 9360
Evidence & further reading1. Portion 223: parcel evidence and decision brief ↗Concept screening, not an approval or funding offer. Current availability must be confirmed.schulden.land/opportunities/data-centres

Schulden Property Co · Unitas Park, Vereeniging
hans@schulden.land · 082 881 9360

Development possibilities for discussion. Confirm current availability, rights, services and project eligibility before committing.