Skip to parcel information
schulden property co

Land portfolio / Farm 594 - I.Q. Gauteng

Enquire with owner

Remainder of Portion 224

Remainder of Portion 224 offers a starting point for phased homes and education, with student accommodation as an alternative to test. The 2020 layout is a proposal; current zoning, ground suitability, lawful access, services and operator demand must be established for a defined first phase.

Download the parcel decision pack

Remainder of Portion 224 · decision briefDownload PDF · 2 pages · 0.03 MB

Edition 2026-10-05 · The pack and this parcel’s decision summary use the same information. Historical records retain their own dates.

Development opportunities to explore

See the commercial proposition, funding context and next steps for uses worth screening on this land.

Location
Farm 594 - I.Q. Gauteng, Unitas Park, Vereeniging
Area basis
Approximately 17.7 ha · GIS; current legal extent unresolved
Development focus, subject to verification
Housing, education & student-living potential
Survey reference
SG 7425/2008
View Remainder of Portion 224 on the map ↗

Decision brief · Reviewed 2026-10-03. Source records retain their own dates.

What is available

Remainder of Portion 224 lies in Unitas Park, Vereeniging, Emfuleni, Gauteng, around the Extension 18–21 precinct. It is approximately 17.7 ha: historical subdivision arithmetic gives 17.6880 ha, while the cadastral GIS reports 17.729841 ha. Neither settles the current title extent; the difference needs surveyor and deeds reconciliation. Confirm the current registered property description.

This brief concerns the remainder, not the original 35.5415 ha parent. Extensions 20 and 22–24 are development records associated with this land, not additional sale parcels to add to its area. Extension 20 is owner-confirmed unproclaimed; the later proposals need reconciliation against the remainder.

Why consider this parcel

The clearest starting proposition is a phased residential and education development. A November 2020 layout proposes three Residential 4 blocks totalling 6.2301 ha, an education component of 3.2569 ha and existing roads. It provides a concrete starting point for a housing developer and school or skills-campus operator, but does not establish current development rights or market demand.

Student accommodation is an alternative use case for part of the site, subject to an operator, campus-specific demand, practical transport and accreditation. Institutional/healthcare and service-industry components appear in separate township records. These require their own current planning and operating confirmations; neither student beds nor an operational hospital is promised.

Transaction expectations

The objective is a land sale. No current asking price or standalone valuation for this remainder was located in the reviewed commercial record. A quotation, availability and the exact land included require confirmation from Hans before a proposal is submitted. Whether the transaction should be standalone or combined with another parcel has not been established. No financing or partnership terms are offered in this brief.

Rights and services

Evidence held and the confirmation still needed for a buyer decision.

Title and parcel status

What the records establish

Historical survey deductions; a 2020 planner’s proposal refers to T2701/2009.

Still to confirm

Current deed, endorsements, seller authority and reconciled extent.

Land-use rights

What the records establish

The 2020 proposal records Agricultural zoning and requests Residential 4. Separate Ext22–24 conditions/layouts are held.

Still to confirm

Current scheme certificate, operative decisions, completed conditions and exact site coverage.

Water and sewer

What the records establish

A 2018 civil report and signed 2019 agreement cover Extensions 18–21, with required works and treatment considerations.

Still to confirm

Applicability to this remainder and new uses; current capacity, costs, works and agreement status.

Electricity

What the records establish

July 2021 correspondence records conditional township approvals and a municipal substation impediment.

Still to confirm

Current connection offer, available capacity and delivery costs/timing for the proposed phase.

Access, ground and environment

What the records establish

The 2020 layout marks no-access edges; the 2015 dolomite study concerns a historical commercial scheme.

Still to confirm

Lawful access, use-specific ground clearance, current environmental scope and buildable footprint.

Matters that could change the decision

  • Land and occupation: reconcile deductions and proposal boundaries before pricing usable land. A 2013 residence-permission letter is held; the underlying agreement and present occupation require review.
  • Ground suitability: commercial dolomite conclusions are conditional and do not authorise residential development. Confirm coverage, intended-use suitability and foundation requirements before adopting a layout or yield.
  • Services and access: obtain a costed first-phase solution and lawful entrance. Nearby infrastructure and older township agreements do not demonstrate a connection available today.
  • Operator and demand: test housing absorption and any education or student operator’s requirements before fixing the use mix; no grant, campus placement or healthcare demand is assumed.

The next step

A prospective buyer should decide whether to undertake a joint site-and-records review for one defined first phase. For that review, the owner should arrange the current title and zoning pack, survey reconciliation, occupation schedule and updated professional services/access position.

Discuss this parcel with Hans ↗
Key evidence references

PDF references use physical page numbers. These are source locators, not confirmation that historical conditions remain current.

  • 2020 planner’s proposal: SRC-cf9fa55ed3e2, PDF pp 1–4; housing/education layout: SRC-0678ddb8ad4d, PDF p 1.
  • 2015 commercial ground comments: SRC-f3862bde0924, PDF pp 1–3. Residential suitability is not established.
  • 2019 services agreement: SRC-7eb9108baeac, PDF pp 3–4, 40–41; July 2021 electrical letter: SRC-8082304c7474, PDF pp 1–2. Scope is Extensions 18–21.

Public documents and sources

Read the scope and date before relying on a record. Valuations are historical opinions at their stated dates, not asking prices. Only the public distribution copies are linked here.

Document index updated 2026-09-17.

Discuss the land with Hans

Hans van Heerden · Owner contact

Ask about current availability, arrange a conversation or request further information.

Tell Hans what you want to build.

Explore a retail precinct, a housing phase or a different idea for the land. Speak directly with the owner about the site that fits your plans.

  1. Share your idea. Tell Hans which land interests you, what you have in mind and when you would like to start.
  2. Explore the opportunity. The parcel packs and source documents are available now to help your team take a closer look.
  3. Shape a proposal. Discuss current availability, the purchase perimeter, price guidance and any feasibility period or conditions you would like to propose.
Download the existing decision packs PDF · 0.18 MB

Schulden Property Co · Unitas Park, Vereeniging, Gauteng, South Africa. Privacy information